Non Conformances

Non conformances are problems that have been found and need be addressed. They can be found anywhere – in a product, in service delivery, in work execution, in a process or even in the Quality Management System itself.  They are a core pillar of a Quality Management System (QMS). The QMS will require you to document and maintain a record of non-conformances, actions taken to address the issue and record of close-out of the issue.

What You Need

      1. A Quality Management System (QMS)

Business processes to manage quality in the organization and in work product delivery.

      1. Non Conformance Report (Form)

A way to efficiently and consistently capture identified non conformances

      1. Non Conformance Register

A log of identified non conformances

      1. Actions / Corrections

Document what you are doing to fix it

      1. Correction Verification

Objective evidence of what was done against each documented action to fix the problem

      1. Correction Acceptance

Sign-off on verification that NCR is closed

      1. Root Cause Analysis (RCA)

Drill in to get to the heart of what went wrong using an RCA method like 5-Why.  There are many different methods of root cause analysis.

      1. Corrective Actions

Do any significant systemic changes need to be made to the quality management system

Non Conformance Register

The table below is an example of what a non conformance register may look like:

Non-Conformance-Register

Anatomy of a Non Conformance Report

The form below is an example of what a non conformance report may look like:

Non-Conformance-Report

1. The general details of the non conformance. Identify who found the issue and important dates toward close. QMS may require someone to actually accept the NCR.

2. Describe NCR in enough detail that someone not at the point of the event can read and understand exactly what it is and what should be done.

3. Damage control – what are you doing immediately to address the issue.

4. What objective evidence was reviewed to confirm the actions were taken and the issue can be closed out.

5. Sign-off typically required by the people responsible for reviewing the objective evidence of actions taken.

6. The organization may decide to undertake a deeper systemic analysis to prevent future occurrences.

7. The RCA may result in corrective actions – process-level changes to prevent recurrence of non conformances like this.